|
Center Cost Survey report |
|
Item
Number:
Shipping Weight: 0lbs. 0oz. |
Price:
$249.00 |
|
|
|
|
|
This first Center Cost Survey was initiated on September 20, 2023, and data were collected through October, in response to member requests for approximate costs associated with building new, or refurbishing existing, briefing centers. The question is a deceptively simple one, as there are many variables that complicate the answer. The following basic information is included in the report: European and US data regarding, pre-build planning time and costs (concept and design), cost per square foot or square meter: overall center, A/V Costs: overall, content & content management, and planned refresh schedule. |
|
|